subsea

mattress lay

castle ship technical management

Subsea mattress lay


With either the MDS 3 system (lays three mattress units in a single ‘dive” OR single mattress deployment using our subsea single mattress frame.  Combine with the I-GRAB ROV technology for cable and pipeline ‘as buried’ surveys and tracking as we are optimised for the Pangeo SBI or TSS 350/450 trackers.

We have two systems capable of subsea mattress lay AND mattress removal.

I-GRAB system:  This solution launches one mattress at a time.  The IGRAB ROV is attached to the mattress frame and propels mattress into position using the 4 powerful subsea thrusters. The hydraulic power pack then releases the pins on the frame to release the matt in position.  The advantage with this system is that a single spread of equipment does the entire job; The ROGE ROV surveys (video / sonar) a pipeline or cable track, and then also lays the Matts and post surveys. One single system does all. Low cost solution with no separate ROV or diver solution required.

MDS 3 system: with the capability to launch and lay three mattress units at the same time. This unit uses 4 powerful subsea thrusters to change the heading and assist to position the matts accurately on the sea floor.  Atlantic Discovery or Atlantic Tonjer will operate this system. (Track record: Project Sept 2016, German waters. IGRAB ROV system simultaneously fitted with a cable tracker to assist with post lay burial inspection and mattress survey)

    ATLANTIC DISCOVERY

    UK NORTH SEA

    ATLANTIC TONJER

    EU AND UK NORTH SEA

    +44 (0)1273 121072

    +44 (0)7785 228484

    sales@castleshiptm.com

    C3 The Knoll Business Centre

    325-327 Old Shoreham Road

    Hove BN3 7GS.  United Kingdom.